Battersea Power Station Plot 6 Meantime Use

Images credited to LDA  Design

Public Realm​
Services Provided
  • Lead Designer

  • Civil Engineering

  • Structural Engineering 

  • Utilities Engineering 

  • Below Ground Drainage

  • Pavement Design

  • Levels & Earthworks Design

​

Project Partners
  • Battersea Power Station - Client

  • Maylim Limited - Contractor

BP6 Meantime use is the redevelopment of the existing project site offices and storage yard into 2no meantime use spaces. It is also a project screen the waste transfer facility from the main power station penthouses.

​

It includes the creation of planter beds 5m high to contain 9m high trees. It also include a double stacked shipping container with commercial use below and tree planting above, extensive steel modification to withstand the forces of the trees within them.

 